Projects/Baggage Handling System for FitsAir

Airport Systems BIM · Sri Lanka

Baggage Handling System for FitsAir

A 45-metre baggage handling BIM package combining LOD 350 mechanical conveyor modelling with architectural, structural and electrical development, Navisworks coordination, annotated layouts and realistic walkthrough production.

FitsAir baggage handling system coordinated BIM model
Project Visual45 Metres · Sri Lanka
System Length45 metres
Mechanical ModelLOD 350
CoordinationNavisworks
Portfolio DateDec 2024
Detailed FitsAir conveyor model views

Coordinate a Compact Airport Conveyor System Across Multiple BIM Disciplines.

IBS Projects' published FitsAir scope centres on a 45-metre baggage handling system. The work combines an LOD 350 mechanical conveyor model with architectural counters and key elements, a structural model featuring a special waffle slab arrangement, electrical cable trunking and families, Navisworks clash coordination, annotated layout drawings and a realistic walkthrough.

What IBS Projects Delivered

Mechanical Modelling, Multidiscipline Context, Coordination and Technical Outputs.

Overall BIM model of the FitsAir baggage handling conveyor system

Mechanical BIM · LOD 350

Baggage Handling System and Key Conveyor Components

IBS Projects developed the mechanical model of the baggage handling system and its key components to LOD 350, establishing the conveyor geometry and equipment arrangement required for coordination and documentation.
Detailed 3D views of the FitsAir baggage handling system and surrounding building elements

Multidiscipline Modelling

Architecture, Structure and Electrical Elements

The published scope also included an architectural model with counters and realistic materials, a structural model with a special waffle slab arrangement, plus electrical cable trunking and key electrical families.
Annotated FitsAir baggage handling system layout and section drawing

Coordination & Documentation

Navisworks Clash Detection and Annotated Layout Drawings

Clash detection and system coordination were undertaken in Navisworks, while required layout drawings were developed with annotations to communicate the coordinated conveyor arrangement clearly.
FitsAir baggage handling layout drawing and sections

Carry the Conveyor Design from Model Development Through Coordination and Documentation.

The FitsAir case study demonstrates a focused BIM workflow where the conveyor system is developed together with the surrounding architectural, structural and electrical context before coordination and documentation.

  • 45-metre baggage handling system
  • Mechanical model and key components at LOD 350
  • Architectural model with counters and realistic materials
  • Structural model with special waffle slab arrangement
  • Electrical cable trunking and key electrical families
  • Navisworks clash detection and system coordination
  • Annotated layout drawings
  • Realistic walkthrough with materials, entourage, animation and lighting

Project Delivery

From Conveyor Geometry to Coordinated Airport-System Information.

The published scope connects LOD 350 mechanical modelling with multidisciplinary context, Navisworks coordination, annotated layouts and visualization.
  1. 01

    Model the System

    Develop the baggage handling mechanical model and its key conveyor components to LOD 350.

  2. 02

    Build the Context

    Develop architectural counters and key elements, the special waffle-slab structural model, electrical trunking and required electrical families.

  3. 03

    Coordinate

    Use Navisworks for clash detection and system coordination across the developed disciplines.

  4. 04

    Document & Visualize

    Prepare annotated layout drawings and develop the realistic walkthrough with materials, entourage, animations and lighting.

Planning an Airport or Conveyor BIM Project?

Bring the System Layout, Building Context and Required Deliverables.

IBS Projects can review your project information and help define the modelling, coordination, technical-drawing and visualization scope required for a clear BIM delivery.